- very happy with this product and look forward to using and getting more. thank you. a happy customer
- The 9 colors might be unnecessary for those who only need a certain color for their project
6
·
Excellent
·
$$Color | [02] 9 Colors X 20 Pcs / 180pcs |
---|---|
Shape | 5mm Flat Top |
Material | Metal |
Shade Material | Polycarbonate |
Power Source | Battery Powered |
🌈 Chanzon 120pcs (6 Colors x 20pcs) 12V 5mm LED Diode Lights 24awg Tinned Copper 7.9 inch UL Wire Assorted Kit Pre Wired (Diffused Frosted Round Lens) LED Assortment in White Red Green Blue Yellow Orange Emitters
15 Review
Upgrade Your Car'S Interior Lighting With Phinlion Super Bright Green LED Bulbs - Pack Of 4
5 Review
Adjustable Focus 405Nm Blue Violet Mini Dot Diode Module Head With 100MW Power For DC 3-5V Micro Tubes
4 Review
Upgrade Your Car Interior With Phinlion Super Bright Ice Blue LED Bulbs - Pack Of 4
4 Review