
I ordered this 3 liter drive belt kit to replace the belt on my new Porter Cable drill. I had about 10 inches left after installation. The instillation lasted about ten minutes. This greatly changed the smooth running of this drill. Drive belts beforehand and were sure they would fit. Every belt-driven machine should have these belts! Update Feb 2014 smooth operation.

π Efficient Roller Chain Detacher Breaker Cutter: A Reliable Tool for Easy Link Removal
3 Review

Roller Chain Link for Connecting Feet
3 Review

Enhanced Roller Chain Feet π Connecting Links: Improved Efficiency and Longevity
3 Review

PGN Roller Chain Feet Connecting: Enhancing Efficiency and Durability
3 Review