Overall it looks like a good, well built patch panel, but once installed and tested, techs spend a lot of time identifying a continuity problem in the attached cables. The cause of the problem was faulty trapezoid stones that were pre-installed in the slab. A total of 6 keystones failed the continuity test. Now it was a waste of time.