Took for the construction of a frame house. The boards are dry and damp, even wet! which lay on the ground under the rains dissolved into bars. 6m board 50x100 runs along like a knife through butter. I cut sheets of osb according to the most cunning patterns. He himself made the stairs to the second floor from a dry planed board, only thanks to this apparatus. Accuracy and power are sufficient to perform the vast majority of construction tasks. In short, a 6x6 summer house from the frame to the window frames was built by one in less than two weeks. Thanks Bosch!