- very happy with this product and look forward to using and getting more. thank you. a happy customer
- The 9 colors might be unnecessary for those who only need a certain color for their project

6
·
Excellent
·
$$






| Color | [02] 9 Colors X 20 Pcs / 180pcs |
|---|---|
| Shape | 5mm Flat Top |
| Material | Metal |
| Shade Material | Polycarbonate |
| Power Source | Battery Powered |

Lamp LED Xiaomi Mi Smart LED Bulb Essential (MJDPL01YL), E27, 9 W, 6500 K
113 Review

Ceiling lamp Yeelight YLXD013-B, 50 W, number of lamps: 1 pcs., color: white
62 Review

Realme 10 Smartphone 8/128 GB RU, Dual nano SIM, Black
87 Review

Smart bulb Yandex with Alice, base E27, 8 W, RGB color
76 Review

Chanzon 10Pcs 8Mm LED Pilot Diode Light With Frosted Round Lens And 24Awg Wiring In 5 Colors, 8Mm Panel Mount + 5Mm 12V Universal Flush Dash Board Indicator Panel Socket Lights Lamp Bulb Set
9 Review

🌈 Chanzon 120pcs (6 Colors x 20pcs) 12V 5mm LED Diode Lights 24awg Tinned Copper 7.9 inch UL Wire Assorted Kit Pre Wired (Diffused Frosted Round Lens) LED Assortment in White Red Green Blue Yellow Orange Emitters
15 Review

Upgrade Your Car'S Interior Lighting With Phinlion Super Bright Green LED Bulbs - Pack Of 4
5 Review

Upgrade Your Car Interior With Phinlion Super Bright Ice Blue LED Bulbs - Pack Of 4
4 Review