Header banner
Revain logoHome Page
Paul Andrews photo
1 Level
1348 Review
43 Karma

Review on Wiremold Floor Cord Management Kit - Corduct, Cord Protector, Wire Organizer, Rubber Cable Cover, Concealer, 5ft - Brown (CDB-5) by Paul Andrews

Revainrating 5 out of 5

Proper preparation is essential

Everyone says it's an installation problem. You're right. You need to properly prepare for the installation as well as many other things. I said I unrolled the strip and flexed and flexed it for about 10 minutes to try and smooth it out. Then I put it outside on a flat surface, put the magazine on one end and put a concrete block on top of the magazine. I tightened it and did the same with the other end. I left it like that in the sun all day. In the meantime, I prepped the hardwood floor I installed the plank on with 91% isopropyl alcohol and a clean cotton rag. the same evening, before it was too late, I took a flat and flexible strip, measured the incisions and cut the strip. Then I quickly prepared the underside of the bar and the floor, applied glue, inserted the cables and fixed them to the floor. I then used a hair dryer to heat the strip and went over the edges. It's good, doesn't lift or curl and goes very well with my hardwood floor. Yes, the preparation and installation took some time. However, since everything is done correctly, there is no problem. to heat the strip and went over the edges. It's good, doesn't lift or curl and goes very well with my hardwood floor. Yes, the preparation and installation took some time. However, since everything is done correctly, there is no problem. to heat the strip and went over the edges. It's good, doesn't lift or curl and goes very well with my hardwood floor. Yes, the preparation and installation took some time. However, since everything is done correctly, there is no problem.

Pros
  • Cut to any length: with scissors or utility knife.
Cons
  • Not bad, but...