Excellent leveling set, good fits, relatively easy installation. Step 1 is to take the instructions provided and toss them straight into the trash can. Pulling out the racks isn't that bad. You will then need to assemble the brace by screwing in the supplied hex head screws before attaching the brace to the top of the rack. Leverage is perfect, 2 inches is the perfect amount for my 18 F150 Super Team. Check out some YouTube videos to see if you're interested. The whole thing took 4 hours and I had access to an elevator. Getting the upper ball joint back into the hole is the hardest part of this build. Enjoy.
Power supply 12V, 40A, 500W (Hongwei HW-12V-500W)
12 Review
MI Motion Sensor YTC4041GL motion sensor
14 Review
CASIO Collection Men AQ-S800W-1B quartz watch, alarm clock, stopwatch, countdown timer, waterproof, power reserve indicator, hand illumination, display illumination, black
13 Review
Oil filter MANN-FILTER W 914/2
27 Review