Works great for a 95 s10, never mind, now it took weeks for everything to break down and I had a rough rubbing noise but I rode it for a few weeks once, that Noise gone, the front looks great, it only took half a day to install everything. Please note my entire front was finished so I said half a day which is better than what I originally quoted in the 1st would take 2 weeks so I am very happy because my project truck will definitely turn up and I will didn't have to give him up for too long.
Oil filter MANN-FILTER W 914/2
27 Review
Winter Tires MICHELIN X-Ice North Xin4 205/55 R16 94T Spiked 2022
21 Review
Power supply 12V, 40A, 500W (Hongwei HW-12V-500W)
12 Review
CASIO Collection Men AQ-S800W-1B quartz watch, alarm clock, stopwatch, countdown timer, waterproof, power reserve indicator, hand illumination, display illumination, black
13 Review