This was a case of "Teeth OK but time for gums". The support boards on the back of the slats are rotten. I removed the slats between the posts and the rotten boards. I added supports, put in new treated wood planks, bolted and replaced the slats. I bought an extra plank to replace the shrinkage after these years. I finished work this morning before it started raining. I'm happy.
π Enhanced Aluminum Profile Connector Bracket Accessories
3 Review
Computer chair Metta SU-BP-8 Pl (SU-B-8 100/001) office, upholstery: mesh/textile, color: 20-Black
26 Review
Enhance Safety and Style with Design House 182014 Standard Handrail
3 Review
π High Precision 7.5mm Slotted Aluminum Piece: Durable and Accurate
3 Review