cuts. I quarreled between them or mere pebbles. It worked perfectly. I had a great opportunity to cover a 30 foot geodesic dome. Remove cedar shingles and lay asphalt. After the first weekend, when I learned how I was going to install the shingles on the circular building, I realized that I would have to cut almost every shingle I would install on the building to different lengths and angles. With these scissors I cut 76 packs of shingles of different lengths and different patterns. I've usedโฆ