Equipped with a '93 Wrangler YJ 6cly. Not a terrible process, Solo did. I followed the instructions but did a few more things. Continue reading. I first made a 1"bl so the fan shroud screws are already off and the 2 screws under the skid plate are already loose. Make sure the first screws you remove are the 3 screws that go into the Go motor. Definitely don't unbolt it, just loosen it a few turns. Then follow the instructions starting on the passenger side. To insert the cross bolt I had to lift the engine out of the bell as instructed and then crash the front of the jeep to the prevent the body from lifting.I used a long 12mm allen key.placed across the opposite side where he inserted the cross bolt to line everything up to get the cross bolt.Keep everything lost and then run the drivers Unscrew the bolts securing the engine block again and then follow the instructions On the driver's side I had to, after lifting the height with the lift ne, manually slide and lift the motor on the bracket to align the bracket and bracket. Just a little more and the cross bolt went in. Tighten each screw until it stops. specifications online. Ready.
Magnetic Oil Drain Plug Bolt With Gasket Washer Seal Included - PitVisit Reusable Aluminum Plug (M14 X 1.5, Silver) For Optimal Engine Maintenance
17 Review
10Mm Drain Hose For Easy Oil Changes By RuggedMade
34 Review
Smartmi convector Smartmi Electric Heater Wifi Model convector with display white (Rostest EAC), CN, white
21 Review
Synthetic engine oil LUKOIL Lux synthetic SN/CF 5W-40, 1 l, 1 kg, 1 pc.
35 Review