Header banner
Revain logoHome Page
Demond Clenney photo
Greece, Athens
1 Level
736 Review
53 Karma

Review on πŸ”Œ Enhance Your Refrigerator's Performance with the Norcold 628661 Power Circuit Board! by Demond Clenney

Revainrating 5 out of 5

Good work. Installation 20 minutes.

Installation takes approximately 20 minutes. Before you remove the cables, take a picture to make sure you connected the new one correctly. Turn off the power and remove the fuse in the converter box before beginning.

Pros
  • Acceptable
Cons
  • Long