
What I was really looking for was a power recovery start delay to start/restart the air conditioner when powered by the standby generator. The delay is needed in order not to overload the generator. I had to disable the high temp shutdown for it to work. Devices exist for very heavy duty applications, but they are expensive and usually need to be hardwired to the power distribution box. Titanium makes a lot of electrical controls and I suggested to them that the manufacturer of this unit make one with no heat cut off and with a 0 to 5 minute time delay instead of 0 to 30 minutes. But for my purpose it works.

VIVREAL 4 In 1 Stud Finder Wall Scanner With LCD Display - Center Finding Beam Finder And Sound Warning For Wood, AC Wire, And Metal Studs (Black/Silver)
24 Review

Qingping Qingping Bluetooth Smart Alarm Clock Green
22 Review

ICQUANZX LCR-T7 Transistor Tester: Advanced TFT Diode Triode Capacitance LCR ESR Meter
14 Review

Cable tester BENETECH GM60
15 Review

📏 Johnson Level and Tool 400EM-S 12-Inch Heavy Duty Metal Combination Square for Professionals, with Inch/Metric Measurements, Silver - 1 Square
8 Review

🔲 Johnson RAS-1B Johnny Square: Professional Aluminum Rafter Square, 7'', Silver - Top Quality with 1 Square
8 Review

Kapro - 353 Professional Ledge-It Try & Mitre Square - For Leveling And Measuring - Features Stainless Steel Blade, Retractable Ledge, And Etched Ruler Markings - 12 Inch
23 Review

➕ Stainless Steel L-Square, Size 3-Inch x 4-Inch, Zona 37-434
8 Review