There is not much to consider here. Installation takes about half an hour and requires no drilling, cutting, or removing factory hoses. All you have to do is unplug the vaporizer tank electrical connector from the back of the tank and remove the factory screws. The canister is then installed in the carriage, the carriage and canister are one piece and bolted back together at the factory. Connect the cable and you're done. I had to remove or move a few zip ties holding the electrical connection to the underbody to get enough slack to route the wire around the back of the sled, but it wasn't that difficult. remember this as soon as you pick up the box. I just wish it didn't lower the ride height (that's why it gets 4 stars) if you look around there are several sleds that do the same thing and actually increase the ground clearance without moving the unit.
ORCISH 12V 13000-lb Load Capacity Electric Truck Winch Kit ๐ with Synthetic Rope - Waterproof Off Road Winch for Jeep, Truck, SUV
35 Review
4WD ORCISH Recovery Traction Boards Tracks Tire Ladder For Sand Snow Mud - Set Of 2 (2Nd Gen Bag + Mounting Pins, Black)
39 Review
Nokian Tires Hakka Green 3 205/55 R16 94H summer
37 Review
Yokohama Ice Guard IG50 215/50 R17 99Q winter
36 Review